Good Shepherd Lutheran Church

Good Shepherd Lutheran Church’s sanctuary and common areas suffered fire damage 2018, which resulted in water damage. Bulley & Andrews was selected as the construction manager to restore and remodel the church, updating all mechanical and electrical systems in the process. The scope of work included:

  • Structural framing rebuild where fire damage occurred
  • Removal of all finishes where water damage occurred
  • A new elevator shaft for a second phased elevator installation
  • Engineered shoring to keep the steeple supported while under construction
  • Removal of all plaster at ceiling level to allow new spray-foam insulation, lighting, and fire suppression system
  • Installation of the church’s first ever air conditioning system
  • Historic finishes and coordination with the church’s organ and furniture vendors were detailed to enable a seamless installation of all systems

Client

Good Shepherd Lutheran Church

Architect / Engineer

Nevin Hedlund Architects, Inc.

Role

Construction Manager

Location

Oak Park, IL

Service

Renovation

Market

Sacred Spaces